A failed door is a normal result, especially on a first inspection. What matters is what you do with the defect list.
Call 0485 032 510Get the inspection arranged
Tell us the building and roughly how many doors, and we will arrange the inspection.
Fire Doors Brisbane — firedoorsbrisbane.com.au — arranges these inspections with a QBCC-licensed contractor across Brisbane, Ipswich, Logan, Redlands and the Gold Coast.
Published 27 October 2026
The inspection exists to find problems. A report with no defects on an older building is more worrying than one with a long list, because it suggests the doors were not looked at closely.
First inspections of buildings that have never been inspected properly usually produce the most defects. The second year is far shorter.
Each failed door should have its own entry: which door, what failed, and what it needs. Group them into three kinds. Adjustments, such as a closer or a latch. Component replacements, such as seals or hinges. And doors that may need replacing.
The first two are usually quick and cheap. The third needs a proper assessment before anyone orders a door.
Doors on exit routes and stairs first. A stair door that does not close puts everyone above it at risk. Then corridor and lobby doors. Then plant rooms and service doors.
Doors that are propped open or have disconnected closers can usually be fixed the same day and should be.
A repair that is not recorded did not happen, as far as the records go. Ask for each fixed door to be re-checked and the result added to the building's record against the original defect.
That closed loop is what makes the record support an Occupier's Statement.
Most failures are repairable: seals, closers, hinges, latches and minor damage. A leaf that has been cut, drilled through, delaminated or water damaged usually is not. The repairs page sets out how that judgement is made.
Get the decision from the licensed contractor in writing, door by door, before approving replacements.
The statement says the installations have been maintained. If serious defects are still open when it is due, talk to the contractor about what can be closed first, and do not sign something the records do not support.